Signal orchestrates the pulse of a city — every intersection timed, every corridor modeled, every phase calibrated to move 10,000+ vehicles per hour without a single wasted green.
Model every phase, every movement, every conflict point before a single controller is reprogrammed. Signal's intersection engine validates timing plans against MUTCD warrants and capacity thresholds in real time — not after a field study.
Phase Sequence — Cycle 112s
Green-to-Capacity Ratio
Conflict Point Analysis
Signal renders every arterial corridor as a dynamic timing plan — green pulses flowing through each intersection in sequence, offset calculations updated live as demand shifts, compliance flags raised automatically against federal standards.
Signal warrants satisfied
Emission reduction documented
Accessible pedestrian signals
Adaptive control framework
Avg Intersection Delay Reduction
Across 47 corridors retimed using Signal's adaptive algorithm vs. pre-implementation baselines. Measured using FHWA's TOPS-BC methodology.
Peak Corridor Throughput
Intersections Optimized
Federal Compliance Rate
Every Signal project delivered MUTCD-compliant timing plans. Zero federal audit findings across 6 years of DOT partnerships.
Avg Annual Fuel Savings
CMAQ-eligible emission reductions documented for federal reimbursement.
"Signal's corridor model flagged a queue spillback issue on our 14th Street arterial that we'd been chasing for two years. The phase adjustment took 20 minutes. The spillback disappeared in the first PM peak."
Marcus Delgado, P.E.
Senior Traffic Engineer
Denver Department of Transportation
Project Context
47-intersection retiming, $2.1M CMAQ grant
A Signal engineer will analyze your corridor — existing timing plans, volume counts, compliance status — and deliver a preliminary optimization brief within 5 business days. No commitment required.
Free Resource
Capacity Analysis Template
The same Excel-based capacity analysis framework Signal engineers use for corridor studies — pre-formatted for HCM 7th Edition calculations, G/C ratio analysis, and FHWA CMAQ documentation. Used by 340+ agencies to build internal justification for signal modernization budgets.
340+ agencies have downloaded this template